Transition Request Sheet

1. Job Information

Customer Name: ____________________________

Job Site / Project Name: ____________________________

Date Needed: __________________

Phone or Email: ____________________________

PO# / Job#: ____________________________

2. Equipment Orientation

Unit Configuration:

  • ☐ Vertical – Upflow
  • ☐ Vertical – Downflow
  • ☐ Horizontal – Left
  • ☐ Horizontal – Right
  • ☐ Ceiling Mounted
  • ☐ Other: ________________________

Photo Upload: ☐ Yes ☐ No

3. Furnace Outlet (NEW Unit)

Width: _____ in     Depth: _____ in     Height Available: _____ in

  • ☐ To top of existing S-lock or cleat
  • ☐ To raw edge of existing plenum
  • ☐ Other: _______________________
  • ☐ Width/Depth: raw edge to raw edge
  • ☐ Width/Depth: drive to drive
  • ☐ Includes flanges / S-cleats

4. Existing Plenum

Width: _____ in     Depth: _____ in

  • ☐ Raw edge to raw edge
  • ☐ Drive to drive
  • ☐ Includes flanges / S-cleats
  • ☐ Inside dimensions
  • ☐ Outside dimensions

5. Offset Details

Side-to-Side Offset: _____ in     Front-to-Back Offset: _____ in

  • ☐ Centered
  • ☐ Offset Left
  • ☐ Offset Right
  • ☐ Offset Forward
  • ☐ Offset Backward

6. Transition Style

  • ☐ Straight Transition
  • ☐ One-Way Offset
  • ☐ Two-Way Offset
  • ☐ Pyramid (4-way)
  • ☐ Custom (describe below)

7. Fabrication Preferences

  • ☐ Turning Vanes
  • ☐ Internal Insulation (½")
  • ☐ Internal Insulation (1")
  • ☐ Include Flanges or S-cleats

Take-off Collar Size: __________    Location: __________________

Special Instructions: ________________________________________

8. Sketch Area

Sketch here or attach a photo