Transition Request Sheet
1. Job Information
Customer Name: ____________________________
Job Site / Project Name: ____________________________
Date Needed: __________________
Phone or Email: ____________________________
PO# / Job#: ____________________________
2. Equipment Orientation
Unit Configuration:
- ☐ Vertical – Upflow
- ☐ Vertical – Downflow
- ☐ Horizontal – Left
- ☐ Horizontal – Right
- ☐ Ceiling Mounted
- ☐ Other: ________________________
Photo Upload: ☐ Yes ☐ No
3. Furnace Outlet (NEW Unit)
Width: _____ in Depth: _____ in Height Available: _____ in
- ☐ To top of existing S-lock or cleat
- ☐ To raw edge of existing plenum
- ☐ Other: _______________________
- ☐ Width/Depth: raw edge to raw edge
- ☐ Width/Depth: drive to drive
- ☐ Includes flanges / S-cleats
4. Existing Plenum
Width: _____ in Depth: _____ in
- ☐ Raw edge to raw edge
- ☐ Drive to drive
- ☐ Includes flanges / S-cleats
- ☐ Inside dimensions
- ☐ Outside dimensions
5. Offset Details
Side-to-Side Offset: _____ in Front-to-Back Offset: _____ in
- ☐ Centered
- ☐ Offset Left
- ☐ Offset Right
- ☐ Offset Forward
- ☐ Offset Backward
6. Transition Style
- ☐ Straight Transition
- ☐ One-Way Offset
- ☐ Two-Way Offset
- ☐ Pyramid (4-way)
- ☐ Custom (describe below)
7. Fabrication Preferences
- ☐ Turning Vanes
- ☐ Internal Insulation (½")
- ☐ Internal Insulation (1")
- ☐ Include Flanges or S-cleats
Take-off Collar Size: __________ Location: __________________
Special Instructions: ________________________________________
8. Sketch Area
Sketch here or attach a photo